GNU bug report logs - #14781
coding system changes cause make check to hang in icalendar tests

Previous Next

Package: emacs;

Reported by: Glenn Morris <rgm <at> gnu.org>

Date: Wed, 3 Jul 2013 19:03:02 UTC

Severity: important

Found in version 24.3.50

Done: Glenn Morris <rgm <at> gnu.org>

Bug is archived. No further changes may be made.

Full log


View this message in rfc822 format

From: Glenn Morris <rgm <at> gnu.org>
To: Stefan Monnier <monnier <at> IRO.UMontreal.CA>
Cc: Kenichi Handa <handa <at> gnu.org>, 14781 <at> debbugs.gnu.org
Subject: bug#14781: coding system changes cause make check to hang in icalendar tests
Date: Mon, 08 Jul 2013 21:46:35 -0400
Stefan Monnier wrote:

>> number of tests run / passed / failed to be accurate. Running them in
>> separate Emacs's would allow them to run in parallel, which would be
>> faster, but might be confusing?
>
> The time to run each test tends to be small, so the overhead of starting
> a separate Emacs session for each one may dwarf the potential speed up
> from parallel execution, unless you have hundreds of cores.

I was meaning one Emacs per file, not per test.
I get about a factor of 2 speed-up on 4 cores this way.
The main issue holding it back is the wildly varying length of time that
each test file takes (the file-notify ones are slow for me).




This bug report was last modified 11 years and 322 days ago.